beautypg.com

Bfb624e, Load test, Installation instructions – BeStar BFB624E User Manual

Page 4

background image

T

h

is

p

ri

n

t

a

n

d

i

n

fo

rm

a

tio

n

t

he

re

i

n

a

re

p

ro

p

ri

e

ta

ry

t

o

B

e

s

ta

r

E

le

c

tr

o

n

ics

I

ndu

s

tr

y

C

o

.,

L

td.

a

nd

s

h

a

ll

no

t

b

e

u

s

ed

i

n

w

h

o

le

o

r

in

pa

rt

w

ith

ou

t

it

s

w

ri

tt

en

c

on

tent

C

B

A

Note

Approved by:

Drawn

Rev.

Date

2

BS/TEA01.090A

6

5

www.be-star.com [email protected]

4

3

Page:3 of 3

1

李毕佳

06.04.18

Drawn by:

Checked by:

Date:

A

B

C

H

G

F

E

D

E

D

F

2

5

6

3

4

G

1

H

BFB624E

Bell

李毕佳

06.04.18

A

BFB624E

10. Load test

Voltage 24VDC
Duration 48hours

1) To install bell, first remove the gong using the hex key provided.

2) Use elther of the two sets of mounting holes to allow installation
to 50mm& 60mm pitch mounting boxes.
3a) When mounting on to mounting box use the wiring access slot.
3b) When wall mounting wire in from the top ensuring wiring will not foul the gong.
4) During installation,always ensure that the terminal block is at the top.
5) Refit the gong, always aligning mounting lugs and fasten tightly with the screw provided.

9. Installation Instructions:

Top

+

+

-

+ve

OUT

+ve

IN

-ve

IN

-

-ve

OUT

Wiring Diagram

50

Wiring Access

60

程久生

郭敏