beautypg.com

Reliability test, 65 张秀琴 赵 峥, Piezo ceramic element – BeStar FT-27T-3.0B1 User Manual

Page 5

background image

5.5 Vibration Test
Vibration Frequency 10~55Hz
Amplitude 1.50mm
Direction 3(x.y&z)
Duration 2hrs each direction (total 6 hrs)
5.6 Drop test
Height 100cm
(to 10mm thickness woodenboard)
Direction 3(x.y&z)
5.7 Solderability Test
Soldering Temperature 270

C

Duration 3 sec
5.8 Accelerated Life Test (ALT)
Thermal Cycling :
Thermal Cycling consists of temperature ramping components for 30 minutes in the
Testing oven from -20

°C to 70°C. The components are then exposed for 1 hour at

The extremes and the cycle is repeated for a total of 15 cycles..
Thermal Soak:
Thermal soak consists of exposing a powered unit to 70

°C and 85% relative humidity

for 45 days.

Notice: All specifications must be satisfied in this condition.

T

h

is

p

ri

n

t

a

n

d

i

n

fo

rm

a

tio

n

t

he

re

i

n

a

re

p

ro

p

ri

e

ta

ry

t

o

B

e

s

ta

r

E

le

c

tr

o

n

ics

I

ndu

s

tr

y

C

o

.,

L

td.

a

nd

s

h

a

ll

no

t

b

e

u

s

ed

i

n

w

h

o

le

o

r

in

pa

rt

w

ith

ou

t

it

s

w

ri

tt

en

c

on

tent

邱 俊

Drawn by:

DRG NO: BS/TEY01.295B

Page:05 of 06

2

1

3

4

www.be-star.com [email protected]

6

5

张秀琴

赵 峥

A

Piezo Ceramic Element

Checked by:

Approved by:

Note

Date

Drawn

Rev.

A

C

C

11.08.16

FT-27T-3.0B1

Date:

B

B

D

D

5.1 Life test at high temperature

Temperature +80

°C

Duration 240hrs

5.2 Life test at low temperature

Temperature -30

°C

Duration 240hrs

5.3 Temperature cycle test

Cycles 5

5.4 Humidity cycle test

Cycles 5

12h

1h

1h

10h

All these tests above should be measured after leaving normal temperature for 2hrs.

E

E

65℃ 90-95% RH

25℃90-95% RH

15min

30min

15min

30min

F

F

+20℃

+20℃

+70℃

-30℃

G

G

FT-27T-3.0B1

5. Reliability test

H

H

2

3

4

6

5

1