GEARENCH PHD0535 PETOL POP-IT Flange Spreader & Prying Tool - Heavy Duty User Manual
Page 8
¾ The outside toes of the tool can be removed and then reset, allowing you to spread
or lift a total of 8 inches. With the toes extended, the spreading or lifting capacity
of the tool is reduced to 20,000 lbs.
Step 3
ALWAYS CHOCK YOUR WORK. Never allow the tool to support the load while
working on the equipment. After the equipment is lifted to the desired amount, set a
chock under the equipment. NEVER PLACE YOUR FINGERS OR ANY OTHER
BODY PART UNDER THE EQUIPMENT WHILE THE POP-IT
®
TOOL IS
SUPPORTING THE LOAD. Flip the direction switch on the ratchet handle to the
right. With one hand on the tool handle, turn the ratchet handle to the right. With one
hand on the tool handle, turn the ratchet handle counter clockwise to lower the equipment
onto the chock. Remove the tool.
Step 4
Perform necessary maintenance/task.
Step 5
Insert the POP-IT
®
Tool beside the chock. Flip the direction switch on the ratchet back to
the left. While holding the tool handle, turn the ratchet handle clockwise until the chock
comes free. After removing the chock, flip the direction switch to the right. Turn the
ratchet handle counter clockwise until the equipment is lowered to its desired position.
Remove the tool.
7