Elmo Rietschle V-VGC 4/6 User Manual
Page 14
![background image](/manuals/316249/14/background.png)
14
|
www.gd-elmorietschle.com © Gardner Denver Schopfheim GmbH, Gardner Denver Deutschland GmbH
Installation
5 Installation
5.1
Preparing for installation
Check the following points:
•
Machine freely accessible from all sides
•
Do not close ventilation grids and holes
•
Suffi cient room for installing and removing pipes
and for maintenance work, particularly for install-
ing and dismantling the machine
•
No external vibration effects
•
Do not suck any hot exhaust air from other ma-
chines into the cooling system.
The oil fi lling pointFig. 1/H), oil sight glass (Fig. 1/I) and oil outlet Fig. 1/K) must be easily accessib-
le.
The cooling air inlets (Fig. 1/E) and the cooling air outlets (Fig. 1/F) must be at least 15 cm away
from adjacent walls. Cooling air coming out must not be sucked in again. For maintenance work
there must be 30 cm in front of the fi lter (Fig. 1/D) and the oil reservoir cover (Fig. 1/T).
5.2 Installation
NOTICE
The machine may only be operated when it is
set up horizontally.
Material damage resulting from the machine
tipping over and falling.
When installed at more than 1000 m above sea
level a reduction in power is noticeable. In this
case we would ask you to contact us
Ensure that the foundation complies with the follow-
ing conditions:
•
Level and straight
•
The bearing surface must be at least the same
size as the machine
•
The bearing surface must be able to bear the
weight of the machine
It must be possible to install the machine on a fi rm foundation without anchoring. When installing on
a substructure we recommend fi xing with fl exible buffers..