Mark and Glue Assembly:
1. Mark the pipe and the fittings at all the connections with a pencil. These marks will be used as a reassembly
guide while gluing to be sure everything is still in the right place and nothing has moved.
2. Loosen the rubber coupling and clamp connection.
3. Carefully pull the double pump assembly back out of the pit.
4. Take the tee assembly off of the primary discharge pipe. Do Not unscrew any of the Teflon taped fittings.
5. Clean all the PVC pipe ends with the PVC cleaner.
Hazardous fumes
.
Follow the cement and cleaner manufacturer’s instructions. Use the PVC
cement in a well ventilated area away from fire or flames.
6. Glue the PVC fittings where indicated by the pencil marks. Wait 10 minutes for the glue to cure.
Final Assembly:
1. Put the double pump assembly back into the pit.
2. Install and tighten the rubber coupling and clamp kit.
3. Make the final float switch adjustments and tighten the mounting clamp and cable ties.
ELECTRICAL CONNECTIONS
Hazardous voltage can cause serious or fatal electrical shock. Review safety instructions before
operating charger. Do not modify cord or plug.
Table I – Model 441 Wiring Connections
Connect the
To the Junction Box’s
Positive (+) lead from the battery
Negative (–) lead from the battery
Positive lead from the charger
Negative lead from the charger
Backup pump float switch
(2 wires)
Positive lead from the pump
Negative lead from the pump
Positive battery connection
Negative battery connection
Positive charger connection
Negative charger connection
Float switch connection
(2 wires)
Positive pump connection
Negative pump connection
Figure 8 – Wiring Connections for Model 441
CHARGER/BATTERY INSTALLATION
NOTICE: An alarm, located in the junction box, automatically sounds when the system runs if the alarm is in the
“Enable” position. The alarm is silenced when the alarm switch is in the “Disable” position.
1.
Apply the square two-sided tape (provided, Key No. 9) to the back of the junction box. Press the junction box onto the
battery box as illustrated in Figure 8.
2.
Connect the charger as shown in Table I and in Figure 9.
3.
Plug the charger into a 115-120 Volt AC outlet delivering at least 15 amps. Do not use a switch controlled outlet. Mark
circuit in main power panel “Backup sump pump power supply; do not turn off”.
4.
With the charger properly connected and plugged in, the panel on the front of the charger will show one of the conditions
illustrated in Figure 9.
©Copyright 2009 Liberty Pumps Inc. All rights reserved 8