beautypg.com

Installation - section b – Gorman-Rupp Pumps 2D-X.75 1P 1462001 and up User Manual

Page 8

background image

D SERIES

OM−01478

PAGE B − 1

INSTALLATION

INSTALLATION − SECTION B

Review all SAFETY information in Section A.

Since pump installations are seldom identical, this

section offers only general recommendations and

practices required to inspect, position, and ar-

range the pump and piping.

For further assistance, contact your Gorman-Rupp
distributor or the Gorman-Rupp Company.

Pump Dimensions

See Figure 1 for the approximate physical dimen-
sions of this pump.

OUTLINE DRAWING

Figure 1. Pump Model 2D-X.75 1P

PREINSTALLATION INSPECTION

The pump assembly was inspected and tested be-
fore shipment from the factory. Before installation,
inspect the pump for damage which may have oc-
curred during shipment. Check as follows:

a. Inspect the pump for cracks, dents, damaged

threads, and other obvious damage.

b. Check for and tighten loose attaching hard-

ware. Since gaskets tend to shrink after dry-
ing, check for loose hardware at mating sur-
faces.

c. Carefully read all tags, decals, and markings

on the pump assembly, and perform all duties
indicated.

d. Check levels and lubricate as necessary. Re-

move the shipping plug from the top of the
gear reducer and replace it with the vented
plug shipped loose with the unit. Refer to LU-
BRICATION in the MAINTENANCE AND RE-
PAIR section of this manual and perform du-
ties as instructed.

e. If the pump and

motor have been stored for

more than 12 months, some of the compo-