Gorman-Rupp Pumps T6A60S-5.7 NG-ESP All serial numbers User Manual
Page 22
OM-06610
SUPER T SERIES
OPERATION
PAGE C - 5
“Pump Setpt A Off”. Press
to increase or
to
decrease to the desired level at which the pump
turns off.
Press
again to advance to “Pump Setpt B On”. If
“B” is to be used, repeat the procedure described
above for adjusting level “A”.
Horn Delay
The horn delay is pre‐set from the factory through
the engine control panel, therefore this function is
not utilized through the EPS.
OPERATION
A Gorman‐Rupp automatic air release valve may
be installed in a bypass line, or the bypass line may
be left open.
A manual shut‐off valve should not be
installed in any bypass line. A manual
shut‐off valve may inadvertently be left
closed during operation. A pump which
has lost prime may continue to operate
without reaching prime, causing dan
gerous overheating and possible explo
sive rupture of the pump casing. Per
sonnel could be severely injured.
Lines With a Bypass
If a Gorman‐Rupp Automatic Air Release Valve has
been installed, the valve will automatically open to
allow the pump to prime, and automatically close
after priming is complete (see INSTALLATION for
Air Release Valve operation).
If the bypass line is open, air from the suction line
will be discharged through the bypass line back to
the wet well during the priming cycle. Liquid will
then continue to circulate through the bypass line
while the pump is in operation.
Lines Without a Bypass
Open all valves in the discharge line and start the
engine. Priming is indicated by a positive reading
on the discharge pressure gauge or by a quieter
operation. The pump may not prime immediately
because the suction line must first fill with liquid. If
the pump fails to prime within five minutes, stop it
and check the suction line for leaks.
After the pump has been primed, partially close the
discharge line throttling valve in order to fill the line
slowly and guard against excessive shock pres
sure which could damage pipe ends, gaskets,
sprinkler heads, and any other fixtures connected
to the line. When the discharge line is completely
filled, adjust the throttling valve to the required flow
rate.
Leakage
No leakage should be visible at pump mating sur
faces, or at pump connections or fittings. Keep all
line connections and fittings tight to maintain maxi
mum pump efficiency.
Liquid Temperature And Overheating
The maximum liquid temperature for this pump is
160
_
F (71
_
C). Do not apply it at a higher operating
temperature.
Overheating can occur if operated with the valves
in the suction or discharge lines closed. Operating
against closed valves could bring the liquid to a
boil, build pressure, and cause the pump to rup
ture or explode. If overheating occurs, stop the
pump and allow it to cool before servicing it. Refill
the pump casing
with cool liquid.
Allow an over‐heated pump to com
pletely cool before servicing
.
Do not re
move plates, covers, gauges, or fittings
from an over‐heated pump. Liquid with
in the pump can reach boiling tempera
tures, and vapor pressure within the
pump can cause parts being disen
gaged to be ejected with great force. Af
ter the pump completely cools, drain the