Gorman-Rupp Pumps 03F3-B 463273 and up User Manual
Page 27
0 SERIES
OM-01189
MAINTENANCE & REPAIR
PAGE E - 8
IMPELLER
SHAFT
SEAL
PLATE
ROTATING
ELEMENT
RETAINER
SPRING
IMPELLER
BELLOWS
SHAFT
SLEEVE
O‐RING
STATIONARY
ELEMENT
Figure 3. Seal Assembly
This seal is not designed for operation at
temperatures above 160
_F (71_C). Do not
use at higher operating temperatures.
Lay the seal plate (9) on a flat surface with the im
peller side facing up.
Subassemble the O‐ring onto the stationary ele
ment and use even pressure to press this subas
sembly into the seal plate until it seats squarely
against the shoulder bore.
Carefully slide the assembled seal plate and sta
tionary seal element over the shaft. Use caution not
to nick or damage the stationary seat. Temporarily
secure the seal plate to the pedestal with two caps
crews and nuts (not supplied).
Subassemble the rotating element into the retainer
and bellows. Lubricate the I.D. of the bellows with
water, and slide this subassembly over the shaft
sleeve until the seal face is just flush with the under
cut end of the sleeve.
Slide the assembled shaft sleeve and rotating por
tion of the seal and onto the shaft until the polished
faces contact. Continue to push the sleeve through
the seal until it is fully seated against the shaft
shoulder.
Install the seal spring.
Impeller Installation
Inspect the impeller and replace it if cracked or
badly worn.
Screw the impeller onto the shaft until tight. Make
sure the seal spring seats squarely over the shoul
der on the back of the impeller.
Pump Reassembly
If removed at disassembly, press the replacement
wear ring (24) into the pump casing until it seats
squarely against the shoulder bore.