beautypg.com

Gorman-Rupp Pumps 88B2-F5L 1323330 and up User Manual

Page 14

background image

OM−02301

80 SERIES

OPERATION

PAGE C − 2

When installed in a flooded suction application,
simply open the system valves and permit the in-
coming liquid to evacuate the air. After the pump
and piping system have completely filled, evacu-
ate any remaining air pockets in the pump or suc-
tion line by loosening pipe plug or opening bleeder
valves.

STARTING

This pump maybe equipped with auto-
matic float switches, and therefore sub-
ject to automatic restart. Keep hands
and clothing away from the unit to pre-
vent injury during automatic operation.
Disconnect the positive battery cable
before performing any maintenance.
Failure to do so may result in serious
personal injury.

Consult the operations manual furnished with the
engine.

Starting

On initial start-up, set the engine speed at the half-
throttle position. Turn the keyswitch on the control
box to the START" position until the engine starts.
Release the key and the switch will return to the

RUN" position.

After the engine starts and the unit is fully primed,
adjust the engine RPM until the desired flow rate is
achieved.

Pump speed and operating condition
points must be within the continuous per-
formance range shown on the curve on
page E-1.

OPERATION

Pump speed and operating condition
points must be within the continuous per-
formance range shown on the curve. (See
Section E, Page 1.)

Lines With a Bypass

Close the discharge throttling valve (if so
equipped) so that the pump will not have to prime
against the weight of the liquid in the discharge
line. Air from the suction line will be discharged
through the bypass line back to the wet well during
the priming cycle. When the pump is fully primed
and liquid is flowing steadily from the bypass line,
open the discharge throttling valve. Liquid will then
continue to circulate through the bypass line while
the pump is in operation.

Lines Without a Bypass

Open all valves in the discharge line and start the
power source. Priming is indicated by a positive
reading on the discharge pressure gauge or by a
quieter operation. The pump may not prime imme-
diately because the suction line must first fill with
liquid. If the pump fails to prime within five minutes,
stop it and check the suction line for leaks.

After the pump has been primed, partially close the
discharge line throttling valve in order to fill the line
slowly and guard against excessive shock pres-
sure which could damage pipe ends, gaskets,
sprinkler heads, and any other fixtures connected
to the line. When the discharge line is completely
filled, adjust the throttling valve to the required flow
rate.

Do not operate the pump against a
closed discharge throttling valve for
long periods of time. If operated against
a closed discharge throttling valve,
pump components will deteriorate, and