It is recommended that the pressure relief valve as-
sembly be replaced at each overhaul, or any time
the pump overheats and activates the valve. Never
replace this valve with a substitute which has not
been specified or provided by the Gorman-Rupp
Company.
Periodically, the valve should be removed for in-
spection and cleaning. When reinstalling the relief
valve, apply ‘Loctite Pipe Sealant With Teflon No.
592’, or equivalent compound, on the relief valve
threads. Position the valve as shown in Figure 1
with the discharge port pointing down.
Final Pump Assembly
(Figure 1)
Install the key (25, Figure 2) in the shaft keyway
and reconnect the power source. Be sure to install
any guards used over the rotating members.
Do not operate the pump without
the
guards in place over the rotating parts.
Exposed rotating parts can catch cloth-
ing, fingers, or tools, causing severe in-
jury to personnel.
Install the suction and discharge lines and open all
valves. Make certain that all piping connections are
tight, properly supported and secure.
Be sure the pump and power source have been
properly lubricated, see LUBRICATION.
Remove the fill cover assembly (28) and fill the
pump casing with clean liquid. Reinstall the fill
cover, install the clamp bar (30) and secure it with
the capscrew (29). Refer to OPERATION, Section
C, before putting the pump back into service.
LUBRICATION
Seal Assembly
(Figure 2)
Before starting the pump, remove the vented plug
(11) and fill the seal cavity with approximately 132
ounces (3,9 liters) of SAE No. 30 non-detergent oil
to the middle of the seal level sight gauge (15)
and
maintain it at the middle of the gauge. Clean and
reinstall the vented plug. Maintain the oil at this
level.
NOTE
The white reflector in the sight gauge must be posi-
tioned horizontally to provide proper drainage.
Bearings
(Figure 2)
The bearing housing was fully lubricated when
shipped from the factory. Check the oil level regu-
larly through the bearing cavity sight gauge (15)
and maintain it at the middle of the gauge. When
lubrication is required, add SAE No. 30 non-deter-
gent
oil through the hole for the air vent (13). Do not
over-lubricate. Over-lubrication can cause the
bearings to over-heat, resulting in premature bear-
ing failure.
NOTE
The white reflector in the sight gauge must be posi-
tioned horizontally to provide proper drainage.
Under normal conditions, drain the bearing hous-
ing once each year and refill with approximately 24
ounces (710 ml) of clean oil. Change the oil more
frequently if the pump is operated continuously or
installed in an environment with rapid temperature
change.
Monitor the condition of the bearing lubri-
cant regularly for evidence of rust or mois-
ture condensation. This is especially im-
portant in areas where variable hot and
cold temperatures are common.
For cold weather operation, consult the factory or a
lubricant supplier for the recommended grade of
oil.
Power Source
Consult the literature supplied with the power
source, or contact your local power source repre-
sentative.