Preinstallation inspection – Gorman-Rupp Pumps T8A60S-F6L 1318431 and up User Manual
Page 9
OM−05517
SUPER T SERIES
PAGE B − 2
INSTALLATION
PREINSTALLATION INSPECTION
The pump assembly was inspected and tested be-
fore shipment from the factory. Before installation,
inspect the pump for damage which may have oc-
curred during shipment. Check as follows:
a. Inspect the pump assembly for cracks, dents,
damaged threads, and other obvious dam-
age.
b. Check for and tighten loose attaching hard-
ware. Since gaskets tend to shrink after dry-
ing, check for loose hardware at mating sur-
faces.
c. Carefully read all warnings and cautions con-
tained in this manual or affixed to the pump,
and perform all duties indicated. Note the di-
rection of rotation indicated on the pump.
Check that the pump shaft rotates counter-
clockwise when facing the impeller.
Only operate this pump in the direction in-
dicated by the arrow on the pump body
and on the accompanying decal. Refer to
Rotation in OPERATION, Section C.
d. Check levels and lubricate as necessary. Re-
fer to LUBRICATION in the MAINTENANCE
AND REPAIR section of this manual and per-
form duties as instructed.
e. If the pump and
engine have been stored for
more than 12 months, some of the compo-
nents or lubricants may have exceeded their
maximum shelf life. These must be inspected
or replaced to ensure maximum pump serv-
ice.
If the maximum shelf life has been exceeded, or if
anything appears to be abnormal, contact your
Gorman-Rupp distributor or the factory to deter-
mine the repair or updating policy. Do not put the
pump into service until appropriate action has
been taken.
Battery Specifications And Installation
Unless otherwise specified on the pump order, the
engine battery was not included with the unit. Re-
fer to the following specifications when selecting a
battery.
Table 1. Battery Specifications
Crank
@ 0
_
F
Reserve
Capacity
(Minutes)
@ 80
_
F
Overall
Dims.
(Inches)
850
120
10.25L
Cold
Amps
Approx.
Amp/
Hr.
Rating
75
6.75W
8.88H
x
x
Voltage
12 Volts
Refer to the information accompanying the battery
and/or electrolyte solution for activation and charg-
ing instructions.
Before installing the battery, clean the positive and
negative cable connectors, and the battery termi-
nals. Secure the battery by tightening the
holddown brackets. The terminals and clamps
may be coated with petroleum jelly to retard corro-
sion. Connect and tighten the positive cable first,
then the negative cable.
POSITIONING PUMP
Use lifting and moving equipment in
good repair and with adequate capacity
to prevent injuries to personnel or dam-
age to equipment. The bail is intended
for use in lifting the pump assembly
only. Suction and discharge hoses and
piping must be removed from the pump
before lifting.
Lifting
Pump unit weights will vary depending on the
mounting and drive provided. Check the shipping
tag on the unit packaging for the actual weight, and
use lifting equipment with appropriate capacity.
Drain the pump and remove all customer-installed
equipment such as suction and discharge hoses
or piping before attempting to lift existing, installed
units.