NXG Technology NX-MOUNT-FLT-L User Manual
Page 6
P6
STEP 3- WOOD STUD INSTALLATION (CONCRETE INSTALLATION SKIP TO 4)
Find stud, mark edge and drill pilot holes in center locations
.
(2
1/3
”)
60mm
STEP 3 A & B
– LOCATE WOOD STUDS AND DRILL PILOT HOLES
LEVEL WALL PLATE
WITH INCLUDED
BUBBLE LEVEL AND
MARK HOLES FOR
DRILL BIT PILOT HOLE
Drill 4- pilot holes
Mark center of wood using stud finder and pencil,
use wall plate to level and mark pilot holes.
This manual is related to the following products: