beautypg.com

NXG Technology NX-MOUNT-FLT-L User Manual

Page 6

background image

P6

STEP 3- WOOD STUD INSTALLATION (CONCRETE INSTALLATION SKIP TO 4)

Find stud, mark edge and drill pilot holes in center locations

.

(2

1/3

”)

60mm

STEP 3 A & B

– LOCATE WOOD STUDS AND DRILL PILOT HOLES

LEVEL WALL PLATE
WITH INCLUDED
BUBBLE LEVEL AND
MARK HOLES FOR
DRILL BIT PILOT HOLE

Drill 4- pilot holes

Mark center of wood using stud finder and pencil,
use wall plate to level and mark pilot holes.

This manual is related to the following products: