P4
STEP 1b
– Position the wall plate at the desired height and mark the top & bottom
mounting points.
(2 ¾”)
70mm
like to mount the shelf
STEP 1c
– Using a 1/8” bit, drill pilot holes in both (all 3) locations (for concrete walls
use 5/16” drill bit).
CONCRETE DRILL BIT
NOT INCLUDED