Derale Performance 2 Pass 8" Series 7000 Copper_Aluminum Power Steering Kit with Mount Brackets User Manual
Diagram #1, Diagram #2
KIT CONTENTS
QTY. DESCRIPTION
1
Oil Cooler
4ft.
11/32” OEM Spec Hose
4
Hose Clamps
Please read these instructions completely before starting the installation.
13200-13210-13212-13213-InstructionSheet
TOOLS NEEDED
Standard Screw Driver
or 5/16” Nut Driver
Dyke Pliers
Razor Knife
QTY. DESCRIPTION
2
Mounting Rods
2
Mounting Clips
Foam Pads
2
1x1
INSTALLATION INSTRUCTIONS
POWER STEERING COOLER KIT
PART # 13200, 13210, 13212 & 13213
(Continues on Page 2)
The Power Steering Cooler can be mounted in multiple locations on your
vehicle. Reference Diagram # 1 for possible cooler positions. #1 is the
ideal location, #2 is second best and #4 being the last choice.
The Cooler core will flow in either direction, there is no specified inlet
or outlet port.
Note:
Diagram #1
COOLER INSTALLATION
(See Diagram #2)
1. Identify the 2 Mounting Rods, 2 Mounting Clips and 2 1x1 Foam
Pads.
2. Install the 2 Mounting Rods thru the Oil Cooler.
3. Take the 1x1 Foam Pads supplied, peel off the paper lining & slide
them onto the Mounting Rods, sticking them against the Cooler.
4. Take the Cooler Assembly with attached looped hose and hold in
the desired location.
5. Install the 2 Mounting Rods thru the Radiator/Condenser core.
Do not use excessive force when pushing the Mounting
Rods through the Radiator/Condenser. Excessive force
could cause damage to the fins and possibly puncture a
tube.
6. Take the Mounting Clips supplied, making sure they are in the
correct direction (Derale writing out) install onto the Mounting Rods
and cinch them until the 1x1 Foam Pads are slightly compressed.
7. Cut off any excess Mounting Rods.
Mounting
Warning:
COOLER LOCATION
When selecting the best location for your vehicle, always consider a
location that will deliver the maximum airflow.
PRE-INSTALLATION
ecure in place using the Hose Clamps. (See Diagram #2)
1. Identify the 11/32” X 4’ Hose and Hose Clamps.
2. Slide one hose clamp on each end of the supplied Hose.
3. Using a dab of oil, lubricate each end of the hose and install hose onto the cooler inlets forming a loop.
4. S
Diagram #2
Mounting
Rods
Foam
Pads
Mounting
Clips
4’ Hose
IMPORTANT
This cooler is designed to install
on the Low Pressure side of the
pump. Do not cut or remove the
High Pressure hose.
Derale Performance, Los Angeles, CA
800.421.6288
www.derale.com