beautypg.com

Grain Systems Bin Accessories PNEG-1850 User Manual

Instructions, High snow load roof with stir-ator instructions

background image

Date: 11-14-11

PNEG-1850

Instructions

1004 East Illinois Street • Assumption, IL 62510 • 1-217-226-4421

PNEG-1850

Version: 1.0

Printed in the U.S.A.
Copyright © 2011 by GSI Group
www.gsiag.com

Page 1 of 3
CN-206048

High Snow Load Roof with

Stir-Ator Instructions

Figure 1

Drill three (3) 7/16" holes in sidewall to mount
Stir-Ator standoff bracket (CRP-7135). Do not
place bracket on stiffeners and space brackets
to avoid roof beam stiffener bracket.

Mount Stir-Ator standoff bracket for HSR (CRP-7135)
to the sidewall using 3/8" x 1" bin bolt (S-455) and
3/8" flange nut (S-9373). Center of the top hole of the
bracket should be 10" below the horizontal seam.

Table of contents