beautypg.com

10° roof assembly instructions – Grain Systems Tanks PNEG-1923 User Manual

Page 4

background image

Page 4 of 7

PNEG-1923

10° Roof Assembly Instructions

Ladder Section Assembly

Two (2) splice plates are required to attach each additional ladder section. The head of the bolt should be
to the inside of the ladder with the splice plate on the outside as shown in

Figure 3

. Use 5/16" x 3/4" bolts

for all connections.

NOTE: With most installations, the last ladder section to reach the concrete will need to be cut to fit.

(See Figure 4 on Page 5.)

Figure 3