beautypg.com

Tie bar detail – Grain Systems Bin Flooring PNEG-1822 User Manual

Page 15

background image

4. Monorail Installation

PNEG-1822 18' Dura-Lok Plank and Support Manual

15

Tie Bar Detail

1. Locate the tie bars between the rails. (Spaced evenly throughout the system.)

NOTE: Tie bars are to be placed at the end of monorail, at each splice and in the middle of the rail

if it is over 16' long. (Not necessarily evenly spaced.) Rail spacing details

on Pages 26-30

,

detail tie bar placements in each layout.

2. A single #10 x 5/8" self-drilling screws may be used to fasten the tie bars at each end to the rails

as necessary.

(See Figure 4B.)

Figure 4B Tie Bar Detail

3. Tie bars should overlap and connect each rail to the next rail. Tie bars should be located along

each side of a rail splice and around the perimeter of the bin, no more than 6" from the end of the rail.

(See Figure 4C.)

Figure 4C Tie Bar Dimension Detail