Banks Power Ford Trucks: (Gas ’04 - 08 F-150 V6 & V8) Exhaust- Monster Exhaust, '04-08 F-150_Mark-LT 4.2L, 4.6L & 5.4L New Body Style (Non-Heritage models) User Manual
Page 7

96319 v.6.0
7
5.
If applicable, loosen the factory
band clamp on the intermediate
pipe. Using spray lubricant, lube the
intermediate pipe hanger pins and
remove the intermediate pipe from the
vehicle.
6.
FOR SCMB AND ECSB MODELS
ONLY. Due to the enormous weight
reduction of the Banks Exhaust
system, the factory muffler front
rubber hanger will be removed for Std.
Cab Medium (6.5’) Bed and Ext. Cab
Short (5.5’) Bed models. Remove the
factory M8x1.25 bolt on the rubber
muffler hanger, and remove the rubber
hanger from the vehicle. See Figure 3.
7.
Install a 2
1
⁄
2
” clamp onto the
inlet of the Banks intermediate pipe.
Install the Banks intermediate pipe to
the factory Y-pipe outlet. Orient the
pipe onto the locating pin and lightly
tighten the 2
1
⁄
2
” clamp to secure the
intermediate pipe (see Figure 4).
FOR ECMB & CCSB CONTINuE TO
STEP 8.
FOR ECLB & CCMB SkIP TO STEP 9.
FOR ECSB & SCMB SkIP TO STEP 13.
8.
FOR ECMB & CCSB ONLY. For
the EcMB cut off 6.75” from the non
swedged side of the Rear Intermediate
pipe. For the ccSB cut off 12.75” from
the non swedged end of the Rear
Intermediate pipe. See Figure 5.
9.
FOR ECMB, ECLB, CCSB & CCMB
ONLY. Install a 3” clamp onto the
Rear Intermediate pipe inlet. Install
the Rear Intermediate pipe inlet into
the Intermediate pipe outlet. Loosely
tighten the clamp to secure the Rear
Intermediate pipe.
ECMB, CCSB & CCMB SkIP TO STEP 11.
ECLB CONTINuE TO STEP 10.
10.
FOR ECLB ONLY. Install a 3”
clamp onto the Intermediate Extension
Pipe. Install the Intermediate Extension
Pipe inlet into the Rear Intermediate
Pipe outlet. Skip to step 12.
11.
FOR ECMB, CCSB & CCMB
ONLY. Install the 3” hanger clamp onto
the Rear Intermediate Pipe. Install a
3” clamp onto the muffler inlet. Install
the Banks Muffler inlet onto the Rear
Intermediate Pipe outlet. Loosely
tighten the 3” clamp to secure the
Banks Muffler. Insert the hanger into to
factory rubber hanger. Skip to step 14.
Figure 3