Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Speed Control- SpeedBrake '06-07 (PDA) For use with PowerPDA User Manual
Page 16

16
97227 v.7.0
Section 2
MoUNTING THE DoCkING STaTIoN aND
CoNNECTING THE BaNkS PoWERPDa
Figure 14
NoTE: This system has been
designed for use with the Palm
Tungsten E2 PDA.
WaRNING: The PDa may be
susceptible to damage as a result
of extended exposure to sunlight,
heat or extreme cold. It is highly
recommended that the PDa
be removed from its mounting
location if the vehicle will be
subjected to high concentrations
of sunlight, heat or cold for
an extended period of time.
Gale Banks Engineering is not
responsible for damage to PDas
resulting from exposure conditions.
CaUTIoN: Do not use force
when working on plastic parts.
Permanent damage to the part
might result.
1.
Locate the universal mount and
docking station in your kit. Interlock
the docking station to the universal
mount by inserting and sliding the
universal mount tabs into the docking
station grooves. See figure 14.
2.
Find a smooth, flat surface suitable
for ease of access and viewing of
the PowerPDA. See figure 15 for an
example. Loosen both knobs and move
the swivel suction plate and docking
station to achieve desired viewing
angle of the PowerPDA screen. Do a
test fit and note the angle necessary
to achieve the correct viewing angle.
3.
Tighten both knobs to lock in the
position (figure 14).
Note: If the universal mount swivel
does not move or is tight after
loosening the hold down knob, then
remove the previously inserted
docking station and slightly loosen the
tension screw. See Figure 16.
4.
With the alcohol swab from your
kit, clean the suction cup and the
mounting area and let dry. With the
suction lever in the up position ensure
the suction cup is flat against the
windshield or smooth, flat surface.
Then, push the suction lever down to
secure in place