Banks Power DynaFact pillar-style gauge mount ('88-05 Chevy_GMC), ('94-07 Dodge), ('87-05 Ford) User Manual
Page 4
4
96417 v.4.0
gauge lines to be run down the back
and exit through the bottom. Secure
the wiring and tubing to the back of
the Gauge Pod, making sure that the
gauge lines do not interfere with the fit
of the two pieces. If interference
occurs, create an opening in the stock
A-pillar for the gauge lines to pass
through. Secure the gauge lines to the
back side of the stock A-pillar.
5.
Insert the ratchet fasteners though
the four holes to secure the Gauge
Pod to the A-pillar.
For All Installations:
6.
Run Gauge lines out through the
firewall toward the engine.
7.
Install the Gauge Pod and A-pillar,
ensuring that lines are not pinched.
8.
Connect the gauge(s) to the vehicle.
Follow the instructions provided with
the gauge(s) for proper installation and
operation.