Banks Power Dodge Trucks: (Diesel ’07 - 12 6.7L Cummins) Exhaust- Monster Exhaust, Split-Dual Quad Tip ,side exit '07-09 Including Mega Cab User Manual
Page 8

8
96477 v.4.0
secure the spare tire hoist cable.
10.
Install the Banks hanger brackets
onto the rear driver-side frame rail
behind the rear shock cross member.
Place the hanger bracket over the
frame rail on the inside. Align the
hole in the center of the frame with
the hanger bracket. Install the
7
⁄
16
”
bolt and washer through the bracket
and frame rail. Secure the bolt on the
outside frame rail using the 2”x 2”
plate,
7
⁄
16
” washer, and
7
⁄
16
” nut. Be
sure the hanger pin is parallel with
the frame rail and torque all hardware
to 48 ft-lb (see Figure 5). Repeat
this step for the installation of the
passenger side hanger brackets.
11.
Install the supplied rubber
insulators onto the Banks hanger
brackets.
12.
Install the driver-side tailpipe
into the Left Y-pipe outlet. Install the
driver-side tailpipe hanger into the
vehicle rubber insulator. See Figure 6.
13.
Install the passenger-side tailpipe
into the Right Y-pipe outlet. Install the
passenger-side tailpipe hanger into the
vehicle rubber insulator. See Figure 6.
14.
Un-clip the axle vent hose outlet
attached to the bed. Re-route the vent
hose on top of the fuel tank and attach
to the bed. Zip tie the vent hose and
brake line to the emergency brake
cable, away from the tailpipe.
15.
Adjust each of the pipes to
ensure that all of the hanger pins
are parallel with the frame-mounted
pins and fully inserted in the vehicle’s
rubber insulators.
16.
Be sure that the two (2) tailpipes
are completely engaged into the
Y-pipe. Rotate the tailpipe until the
hanger pins are parallel with the
frame-mounted pin.
Note: Recommended distance
between exhaust tip and body is a half
(
1
⁄
2
”) inch.
Figure 4