Zephyr COK-E48SX User Manual
Page 14
A
B
min 28”
max 36”
C/L
C/L
14 1/2”
Duct Cover
Ceiling Bracket
7 1/2”
Attach screws to
ceiling bracket
C/L
C
21”
Duct Cover
Ceiling Bracket
www.zephyronline.com
1. Measure from cooking surface to hood bottom, level and mark line A.
2. Plum and mark center line.
3. Mark mounting height, line B (14 1/2” from line A). This is the top of the hood.
4. Measure up, 7 1/2” from line A and mark mounting spread from C/L Line C. (21”)
5. Follow center line up to the ceiling, measure and mark 6” from the wall. Make sure the spot you mark is still
on the center line. This is where the
center of the duct cover ceiling bracket will mount.
6. Place duct cover ceiling bracket onto ceiling and mark the (2) holes where screws will be attached. If attaching
bracket to drywall only, drill and insert provided anchors into the marked holes. Cut out inside diameter of the
ceiling bracket to fit the 6” or 8” round duct work. Attach bracket to ceiling with (2) screws provided.
7. Prepare duct work and electrical.
All Electrical work must be performed by a qualified electrician or person with similiar
technical know and background.
For personal safety, remore house fuse or open circuit beaker before beginning installation.
Do not use extension cords or adapter plug with this appliance.
Follow National Electrical Codes or prevailing local codes and ordinances.
Electrical Supply:
This appliance requires a 120V 60Hz electrical supply, and connected to an individual, properly grounded branch
circuit, protected by a 15 or 20 ampere cicuit breaker or time delay fuse. Wiring must be 2 wire with ground.
Please refer to Electrical Diagram labeled on product.
G
NI
N
R
A
W
-
L
A
CI
R
T
C
E
L
E
-
n
oi
t
all
at
s
nI
d
o
o
H
g
ni
r
a
p
er
P
12