beautypg.com

Zanussi ZHI 600 User Manual

Page 12

background image

12

A: Built-in Electric Hob:

650mm clearance

B: Built-in Gas hob:

700mm clearance

C: Slot-in Electric Cooker: 685mm clearance
D: Slot-in Gas Cooker:

787mm clearance

Hob

Clearance Height

A clearance height of 650mm (25 1/2 ”) is required when
installed above a built-in electric hob, or 700mm (27 1/2
”) when installed above a built-in gas hob.

A clearance height of 685mm (27”) is required when
installed above a slot-in electric cooker, or 787mm (30
1/2 ”) when installed above a slot-in gas cooker.

When installed between adjoining wall
cabinets, the wall cabinets must not overhang
the hob and the distance between the
underside of the cabinet and the worktop must
be 450mm. If the height of the wall cabinet is
less than 450mm, a gap of 50mm must be
maintained either side of the hob.

This cooker hood must not be installed above
a cooking appliance with a high level grill.

Unpacking

The fittings supplied to install this cooker
hood can be found with the instruction book
inside the packaging.

The fixing kit comprises:

2 - Wall fixing brackets
6 - Decor panel fixing screws
4 - Security fixing screws

Fitting the Wall Brackets

1.

Use the paper template provided to mark the hole
positions on the wall for the bracket fixing screws
(not supplied).

2.

Check the hole distances are correct with a tape
measure as stated on the template.

3.

At this stage it is important to allow 15mm
(1/2”) clear space above the cooker hood to
enable it to be hooked onto the brackets and for
subsequent removal for decorating or servicing.