Inst allation - preliminary operations – Zephyr CPA-E48ASX User Manual
Page 11
11
www.zephyronline.com
Inst
allation - Preliminary Operations
Attention! The installation requires several steps
where is asked to temporarily remove some
particulars and screws, We recommend to record
and keep all of these components in a safe place
ready to be used as required.
•
Remove stainless mesh filters (See relative
paragraph on Maintenance section of this manual).
•
Release the 4 per side threaded knobs and remove
the internal left-right side covers.
•
Unscrew the 4 screws that fix the cover to the
Junction box, to access mains connection area.
This manual is related to the following products: