beautypg.com

Installation, Gas connection, Cut out size – Zanussi ZGF 982 User Manual

Page 10

background image

10

Installation

IMPORTANT:

This hob must be installed by a

competent person to the relevant Gas Standards.
Any gas installation must be carried out by a
competent person.
The manufacturer will not accept liability, should
the above instructions or any of the other safety
instructions incorporated in this book be ignored.

WHEN THE HOB IS FIRST INSTALLED

Once the hob has been installed, it is important to
remove any protective materials, which were put
on in the factory.

On the end of the shaft, which includes the G 1/2"
threaded elbow, adjustment is fixed so that the washer
is fitted between the components as shown in the
diagram. Screw the parts together without using
excessive force.

Gas Connection

Connection to the gas supply should be with either rigid
or semi-rigid pipe, i.e. steel or copper.
The connection should be suitable for connecting to R
1/2" (1/2 BSP male thread).
When the final connection has been made, it is essential
that a thorough leak test is carried out on the hob and
installation. Ensure that the main connection pipe does
not exert any strain on the hob.

A)

End of shaft with nut

B)

Washer

C)

Elbow

It is important to install the elbow correctly, with
the shoulder on the end of the thread, fitted to the
hob connecting pipe.
Failure to ensure the correct assembly will cause
leakage of gas.

FO 0814

FO 0264

Cut Out Size

The dimensions of the cut-out are given in the diagram.

Rectangular cut-out size for hob

FO 2349

830

480

30

150 min

Dimensions are given in mm.