beautypg.com

Service manual – combo brewer, Important safeguards/conventions, Cbs • cbp – Wibur Curtis Company PTT3 User Manual

Page 7

background image

7

4. Pour ground coffee into

brewcone marked

COFFEE

6. Press COFFEE Brew button.

5. Position filled

brewcone

into brew

rails.

1. The brewer should be ON (Confirm at rear toggle switch, then press ON/OFF button on control panel). Ready-to-Brew should be

displayed on the UCM screen.
2. Make sure folding airpot deck is rotated upright. Place a clean, empty airpot on the airpot brew deck.
3. Place a new paper filter into the brewcone.

BREWING INSTRUCTIONS – COFFEE

Important Safeguards/Conventions

Service Manual – Combo Brewer

This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an

authorized Wilbur Curtis service center.

• Do NOT immerse the unit in water or any other liquid

• To reduce the risk of fire or electric shock, do NOT open top or front panel. No user serviceable parts inside.

• Keep hands and other items away from hot parts of unit during operation.

• Never clean with scouring powders, bleach or harsh implements

Conventions

WARNINGS – To help avoid personal injury

Important Notes/Cautions – from the factory

Sanitation Requirements

Your Curtis Combo Brewer is Factory Pre-Set and Ready to Go… Right out of the Carton.

Following are the Factory Settings for your Coffee/Tea Brewing System:

• Brew Temperature = 204°F

• Brew Volume = Set to dispensing vessel requirements

(2.2 liters)

Generally there will never be a reason to change your G3 programming. However, should you need to make slight adjustments to meet

your brewing needs, programming instructions are provided later in this manual.

System Requirements:

• Water Source 20 – 90 PSI (Minimum Flow Rate of 1 GPM)

• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.

Equipment to be installed to comply with applicable federal, state, or local plumbing/electrical codes having jurisdiction.

SETUP STEPS

The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water filter to the

brewer. NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with extremely hard

water, we suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your brewing system and enhance

coffee and tea quality.

1. A 1/4” Flare has been supplied for water line connection. Use tubing sized sufficiently to provide a minimum of 1.0 GPM.

2. Connect the unit to an appropriate electrical power circuit.

3. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill. When the water level in the tank rises

to the correct volume, the heating element will energize automatically. With G3 Systems there is no danger of element

burnout due to an unfilled heating tank.

4. The heating tank will require 20 to 30 minutes to reach operating temperature (204°F) as indicated by the READY-TO-BREW

LED readout.

5. Important: Run one full TEA brewcycle first, before running a coffee brewcycle to purge water lines and valves of air. Five

seconds of pulsing dilution water at the beginning of each TEA brewcycle is normal pre-programmed operating behavior.

NSF International requires the following water connection:

1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for

cleaning underneath.

2. In some areas an approved backflow prevention device may be required between the brewer and water supply.

CAUTION: Please use

this setup procedure

before attempting to use

this brewer. Failure to follow the

instructions can result in injury or the

voiding of the warranty.

WARNING HOT LIQUID,

Scalding may occur.

Avoid splashing.

CAUTION: DO NOT

connect this brewer to hot

water. The inlet valve is

not rated for hot water.

IMPORTANT: After

setup, run a full TEA

cycle first before running

a COFFEE cycle. Place an empty

tea container to catch both hot water

from the brewcone and dilution water

from spout on the front cover.

Models:

• CBS

• CBP