Vinotemp WINE-MATE VINO-2500SSR User Manual
Vinotemp Refrigerators
VINO2500-6500SSR
Installer’s Instruction
Federal law requires that WINE-MATE split cooling systems be
installed by an EPA certified refrigeration technician.
WINE-MATE split system is shipped as components and is ready for use only
after a certified refrigeration technician has properly installed, evacuated,
charged and tested the system. Proper installation is critical. Vinotemp can only
warrant the quality of the components. The installation and proper operation of
the system must be warranted by the installer. Installation of the system must be
done in accordance with all state and local building and electrical codes.
The condensing unit and evaporator unit are connected by a liquid line and an
insulated suction line that are supplied by the installer. These lines must be
properly sized for the distance between the two units. After the units and the lines
are installed, the system must be pressure tested. If no leaks are found,
evacuate and charge system. Refrigerant amount will vary depending on the
length of line set.
1. Condensing Unit
• Place the condensing units WM250-650SCU in a
properly ventilated location. If it is not, heat exhausted
by the condensing unit will build up and the cooling
system will not operate properly.
• Condensing unit shall be elevated to avoid possible
flooding and shaded from direct sun. It shall not be exposed to
temperatures higher than 110
°
F or lower than 50
°
F (optional low ambient
kit available).
• Leave minimum 5 feet clearance for the exhaust side and leave minimum
1 foot clearance for the fresh air intake side.