beautypg.com

Distribution blower installation, Shaker grate handle installation – United States Stove Company 1600M User Manual

Page 8

background image

8

DISTRIBUTION BLOWER INSTALLATION

Distribution blower slides onto rear of furnace.

Engage blower flange with channels and press down.

SHAKER GRATE HANDLE INSTALLATION

1. Attach angle with two 1/4" x 3/4" hex bolts and two 1/4"

lock nuts.

2. Attach handle with 1/4" x 1" hex bolt and 1/4" lock nut.

3. Put brass knob onto end of handle.

SMOKE DOOR INSTALLATION

INSTALLING ASH DOOR SPIN DRAFT

1. Screw spin draft onto 3/8" x 2-1/2" carriage bolt.

2. Screw spin draft and bolt assembly into ash door

allowing approximately 1/2" of the bolt to extend
beyond the inside of the door.

3. Secure bolt in place with 3/8-16" locking nut.

SPIN DRAFT CAP

3/8-16 x 2-1/2"
CARRIAGE
BOLT

SMOKE DOOR

SMOKE DOOR CLIPS

1/4" X 1-1/4"
CARRIAGE BOLTS

FRONT
OF
FURNACE

FUEL
LOADING
DOOR
FRAME

1/4" LOCK
NUTS

3/8-16" LOCK NUT

1

2

3