beautypg.com

Factory-installed drain pump, Important, U-line electrical / plumbing specfications 13 – U-Line CO29 User Manual

Page 15

background image

U-Line Electrical / Plumbing Specfications

13

Factory-Installed Drain Pump

If your drain line will run up to a stand pipe, disposal or spigot
assembly, or does not otherwise meet the requirements for a
Gravity Drain, you may have ordered the CLR2160 or
CLRCO2175 with a U-Line P60 Drain Pump. See Below for typical
installations requiring a Drain Pump. If you need to install a P60
Drain Pump into your unit, see Locally-Installed Drain Pump on
Page 14.

Typical Installations Requiring a Drain Pump

IMPORTANT

IMPORTANT

Before installing your U-Line CLR2160 or CLRCO2175
with Factory-Installed U-Line P60 Pump, it is extremely
important to check and test all hose connections at the
drain pump. There is a possibility that hose connections
may have loosened during shipment.

To check and test hose connections:

1. Make certain the unit is not plugged into an electrical outlet.

2. Carefully push the power cord grommet through the hole in the

back panel.

3. Remove 12 screws and back panel.

IMPORTANT

IMPORTANT

Back panel serves as a guard. DO NOT put your hands
inside the ice maker cabinet or attempt to touch any
components except the discharge tube during testing.

4. Check that the clamps and hose connections are tight at the

following areas:

• Discharge tube (A)
• Drain tube (B)
• Vent tube (C)

5. Place a suitable container beneath the pump’s discharge tube.

(The bucket must be able to hold a minimum of one gallon.)

6. Plug the ice maker power cord into a properly grounded,

polarized electrical outlet.

7. Place the unit into OFF mode by holding power key for 10

seconds. Not doing this will cause the unit to start the fill cycle
which will run for 3 minutes.

8. Verify pump operation by pouring one gallon of water into the

ice storage bin of the ice maker. The pump should energize and
pump the water into the container.

9. At this time, verify that all tube and clamp connections are tight

and leak-free.

10. Unplug unit power cord from electrical outlet.

11. Reinstall back panel.

Cold

Water

Hot

Water

Waste

Waste

Shut-Off

Valve

Stand Pipe
P60 Pump Required

Air Gap

(Optional Hook-Up)

Cold

Water

Hot

Water

Waste

Shut-Off

Valve

Disposal Assembly
P60 Pump Required

Waste

Cold

Water

Shut-Off

Valve

Hot

Water

Air Gap

(Optional Hook-Up)

Y-Branch Tailpiece
P60 Pump Required

Power

Cord

Grommet

Drain

Fitting

Back

Panel

Water

Connection

Screws

Back View

Side View

B

B

A

C

C