4 recommended operating conditions, 2 equipment, 1 power supplies – Texas Instruments BQ24450EVM User Manual
Page 3: 2 loads, 3 meters, 3 equipment setup
www.ti.com
Equipment
1.4
Recommended Operating Conditions
Table 2. Recommended Operating Conditions
Symbol
Description
Min
Typ
Max Unit
Vin, J1
Supply Voltage
9.5
10.0
10.5
V
Vout, J4
Battery Voltage (3-cell lead-acid battery)
4
7.5
V
Iin
Supply Current
0
0.5
A
Iout
Charge Current
0
0.5
A
2
Equipment
2.1
Power Supplies
Power Supply #1 (PS#1): Adjustable from 0 to
≥
10 VDC at
≥
1A; used for input J1.
Power Supply #2 (PS#2): Adjustable from 0 to
≥
10 VDC at
≥
1.5A; used for Battery Load Board.
2.2
Loads
Load #1: Battery Load Circuit Board, PR1010-2, as shown in
2.3
Meters
Three Fluke 75 DMMs (equivalent or better).
3
Equipment Setup
The original test setup of HPA691 is shown in
.
1. Set the PS #1 for 10V, 1A current limit and then turn off supply. Connect PS#1 across J1, J2 (VIN,
GND).
2. Connect a voltage meter (VM #1) across J1, J2 (VIN, GND)
3. Set PS#2 to 5.2V and then turn off supply. Connect to the Battery Load Circuit Board (P/S+, P/S–)
4. Connect Load #1 (BAT+, BAT–) across J4, J5 (VOUT, GND).
5. Connect a voltage meter (VM#2) across J4, J5 (VOUT, GND).
6. Connect a voltage meter (VM#3) across sense resistor on Load #1.
7. Verify the jumpers are placed correctly as per,
Figure 1. Original Test Setup for HPA691 (bq24450 EVM)
3
SLUU464 – November 2010
bq24450EVM
© 2010, Texas Instruments Incorporated