External view requirement, Hanging down of indoor unit, Dimension – Toshiba RAM-SM560BT-E User Manual
Page 71

68
15 to 20
Hanging bolt
Square washer
Hexagonal nut
Nut with flange
(or washer and nut)
20 to 30
External view
REQUIREMENT
The hanging bolt pitch on horizontal direction (B) is not halved at center with the ceiling opening size.
Therefore, check the relational position in the following figure.
1. Hanging down of indoor unit
Refer to installation figures of hanging material
and hanging bolt.
• Adjustment of hanging bolt length and nut
position
Adjust hanging bolt length and nut position as
shown in the figure before hanging down the
indoor unit.
NOTE :
Be sure to set the indoor unit horizontally so as not to
cause malfunction of the float switch or leakage of water.
Considering pipe/wire connecting work inside the ceiling after the indoor unit has been hanged, select an installation
place and determine piping direction.
• If the ceiling has been already set, prepare refrigerant pipe, drain pipe, connecting wire, switch panel cord, etc. at
the place where pipe and wire are connected before hanging the main unit.
• Dimension
RAV-SM560BT-E
RAV-SM800BT-E
A
B
F
G
H
J
K
M
N
700
750
12.7
6.4
252
280
280
1
2
1000
1050
15.9
9.5
252
580
290
2
3
Hanging bolt pitch B
Main unit dimension A
Hanging bolt
H
4-M10 screw
(Arranged
locally)
Refrigerant pipe
connecting port
(Liquid side ØG)
Main unit dimension 800
75
25
210
Hanging bolt pitch 565
720
630
170
320
Drain pipe connecting port
For vinyl chloride pipe
(Inner dia. 32,
Nominal dia. 25)
2-Ø26 power supply,
pull-out port of remote
controller cord
460~640
450
Ceiling opening
dimension
470
305
155 to
335
120
90
Ø125 knockout hole
(Rear face)
Check panel
Suction port
(with air filter)
J = M x K
Refrigerant pipe
connecting port
(Gas side ШF)