S210 Wiring Block Instructions
Seat the conductors and trim
off the excess wire with the
cutting edge of the Siemon S210
Multi-Pair Termination Tool (P/N:
S788J4-210) or equivalent.
NOTE: Be sure that the cutting edge is
properly oriented prior to trimming the wire.
11
Visually inspect the conduc-
tor and cable placement to
eliminate miswires or reversals.
12
Insert a connecting block
(P/N: S210C-4) into the head
of the Siemon termination tool.
13
Label the circuits then slide
the designation strip into the
label holder (P/N: S210-HLDR) and
snap the holder onto the wiring
base. Complete the connections
using CJ5 series cross-connect wire
or patch cables.
NOTE: Remove designation strips prior to
removing base from legs.
15
The Siemon vertical wire
manager (P/N: S100A2) can
be ordered separately and mounted to
the legs of the S210 block to provide
vertical cable management for S210
patch cords or cross-connect wire.
16
To assist safe installations, comply with the following:
A. Use caution when installing or modifying
telecommunications circuits.
B. Never touch uninsulated wire terminals unless
the circuit has been disconnected.
C. Never install this device in a wet location.
D. Never install wiring during a lightning storm.
Carefully align the connecting
block over the wiring base
with the blue marking to the left side
of the block (printed side down) and
seat the connecting block.
14
S210 Patch Plug
Position plug with icon
pocket on top when mating with
S210 connecting block.
17
© 2007 Siemon
R
e
v.
C 07/07 100.6634
Global Headquarters
Watertown, Connecticut USA
Tel: (1) 866-548-5814
For a complete listing of our global offices visit our web site
www.siemon.com