beautypg.com

S210 wiring block instructions – The Siemon Company S210 User Manual

Page 2

background image

S210 Wiring Block Instructions

Seat the conductors and trim
off the excess wire with the

cutting edge of the Siemon S210
Multi-Pair Termination Tool (P/N:
S788J4-210) or equivalent.

NOTE: Be sure that the cutting edge is
properly oriented prior to trimming the wire.

11

Visually inspect the conduc-
tor and cable placement to

eliminate miswires or reversals.

12

Insert a connecting block
(P/N: S210C-4) into the head

of the Siemon termination tool.

13

Label the circuits then slide
the designation strip into the

label holder (P/N: S210-HLDR) and
snap the holder onto the wiring
base. Complete the connections
using CJ5 series cross-connect wire
or patch cables.

NOTE: Remove designation strips prior to
removing base from legs.

15

The Siemon vertical wire
manager (P/N: S100A2) can

be ordered separately and mounted to
the legs of the S210 block to provide
vertical cable management for S210
patch cords or cross-connect wire.

16

To assist safe installations, comply with the following:

A. Use caution when installing or modifying

telecommunications circuits.

B. Never touch uninsulated wire terminals unless

the circuit has been disconnected.

C. Never install this device in a wet location.

D. Never install wiring during a lightning storm.

Carefully align the connecting
block over the wiring base

with the blue marking to the left side
of the block (printed side down) and
seat the connecting block.

14

S210 Patch Plug

Position plug with icon

pocket on top when mating with
S210 connecting block.

17

© 2007 Siemon

R

e

v.

C 07/07 100.6634

Global Headquarters

Watertown, Connecticut USA

Tel: (1) 866-548-5814

For a complete listing of our global offices visit our web site

www.siemon.com