Building in, Installation, Building over a cupboard or drawer – Tricity Bendix TBE 635 User Manual
Page 11: Supply connections, Cut out size
11
Building In
ON/OFF SWITCH
FLEX
OUTLET
ON/OFF SWITCH
FLEX
OUTLET
FO 0763
FO 0764
1
2
Building over a cupboard or
drawer
If the hob is to be installed above a cupboard or drawer it
will be necessary to fit a heat resistant board below the
base of the hob on the underside of the work surface.
It is also recommended to carry out the electrical
connection to the hob as shown in diagrams 1 and 2.
Rectangular cut-out size for hob
Installation
The hob must be installed according to the
instructions supplied.
The hob must be installed by qualified personnel
to the relevant British Standards.
Please, ensure that, once the hob is installed, it
is easily accessible for the engineer in the event
of a breakdown.
Supply connections
This hob is designed to be connected to 230-240 V
(50Hz) electricity supply.
The hob has a terminal block which is marked as follows:
L
- Live terminal
N
- Neutral terminal
or E
- Earth terminal
The cable used to connect the hob to the electrical supply
must be 6mm, PVC twin and earth, and fused to 30amp.
It is necessary that you install a double pole switch
between the hob and the electricity supply (mains), with
a minimum gap of 3mm between the switch contacts
and of a type suitable for the required load in compliance
with the current rules.
The switch must not break the yellow and green earth
cable at any point.
550
470
55 min.
30
FO 2098
WHEN THE HOB IS FIRST INSTALLED
Once the hob has been installed, it is important
to remove any protective materials, which were
put on in the factory.
The manufacturer will not accept liability, should
the above instructions or any of the other safety
instructions incorporated in this book be ignored.
Cut Out Size
The dimensions of the cut-out are given in the diagram.