E. Filter Section: Standard fi lter section constructed shall be

V-bank style, with disposable or cleanable fi lters. Filter type
options include but are not limited to: permanent aluminum
mesh, fi berglass throw-away, pleated-panel polyester rated at
30% fi ltration effi

ciency or fl at-panel polyester rated at 30%

fi ltration effi

ciency.

F. Service Platform: Each air handler shall be furnished with a

minimum 48" deep service platform running the full width
of the air handler. Th

e platform shall be constructed with a

minimum 1" thick grating, an OSHA-Approved hand rail
on three sides and steel safety chains on the remaining sides.
Ladder access to be provided by others.

G. Smoke Detector: A smoke detector shall be provided to shut

off air handler if smoke is detected.

H. Carbon Dioxide (CO

2

) Detector: A room-mounted carbon

dioxide sensor shall be provided for initiating additional
outdoor ventilation.

I. Mixing Section (Optional): Th

e mixing box shall be provided

with opposed-blade return air and fresh air dampers with
modulating actuator(s). Th

e mixing box shall be capable of

0-100% fresh air to return air ratio. Standard damper control
shall be controlled by a potentiometer. A photohelic shall
be provided for automatic control of the dampers based on
building pressure (optional).

2.9 PERFORMANCE

A. See Schedule on plans.

PART 3: EXECUTION

3.1 INSTALLATION

A. Th

e unit shall be started per the instructions in the

Installation, Operation, and Service Manual by the installing
contractor. A factory provided fi eld start up form shall be
fi lled out by the contractor and mailed to the manufacturer.
Th

e start-up shall include, but not be limited to:

Verifi cation of proper supply power and fuel.

Verifi cation that electrical terminals are secure.

• Proper air fl ow balance.

Verifi cation of combustion effi

ciency and proper burner

adjustments

• Testing of all safety and operating controls.

• Setting of [High and Low][Modulation] fi re.

B. One copy of the Installation, Operation, and Service Manual

shall be enclosed in the unit control panel. Th

e manual

shall consist of recommended installation procedures
and guidelines, inspection, initial start-up, operating,
maintenance and troubleshooting sections.

3.2 SCHEDULES

A. See plans.

INDIRECT-FIRED AIR HANDLER GUIDE SPECIFICATION