beautypg.com

Redring 650 User Manual

Page 8

background image

6. With the stop valve connected, flush the pipe-work through to remove any particles

etc., before making the final connection to the shower. Blockage in the waterways
(particularly the handset and solenoid valve) will prevent the heater working properly.

7. The shower is designed to have an open outlet and should only be used with ‘Redring’

recommended fittings. Do not connect the showerhead until after the shower front cover
and removable side section are fitted.


WARNING - DO NOT FIT A TAP ON THE SHOWER OUTLET. TAKE CARE TO AVOID
RESTRICTING THE OUTLET AND FLOW FROM THE SHOWERHEAD OR THE
PRESSURE RELIEF DEVICE.

d) Electrical Connections

The electrical installation must be in accordance with the current BS. 7671 (I.E.E.
regulations). If in doubt consult a qualified electrician.

1. The shower is designed for a single-phase A.C. electrical supply. Please check the rating

plate on the unit to see what details apply.


2.






For the 9.5kW you

may be able to use 6mm² cable if Method 1 (clipped direct) is used.

Remember to up rate the cable if it runs in thermal insulation in a loft, or for longer
distance

3. A means for disconnection in all poles must be

incorporated in the fixed wiring in accordance with the
wiring rules. We recommend a ceiling switch mounted in a
convenient position.

4. Cut back cable as in diagram 10. Connect cable to

terminal block making sure that ALL the retaining screws
are VERY tight and that no cable insulation is trapped in
the block.

Cable Sizes

Fuse/ MCB

9.5 / 8.7kW 240 / 230V
10mm²

40 or 45A Cartridge fuse

10.5 / 9.6kW 240 / 230V
10mm²

45A Cartridge fuse / MCB

Diagram 10

8

Diagram 9