Opera tion – Raritan Engineering PST*03 User Manual
Page 2
2
OPERA
TION
(depends on installation chosen)
Single Button operation -
Both toilet and Purasan are operated by one of the
following options:
Option #1:
Switch Panel
"Push to Cycle" button activates both the toilet
and treatment cycle.
Note: Toilet flush time is set at 10 seconds,
after initial 10 seconds holding the button down
will momentarily flush the toilet.
Option #2:
Toilet Push Button -
Flushing toilet will activate treatment cycle.
Note: Toilet may be flushed as often as neces-
sary, do not exceed recommended flush volume.
Independent Button operation -
1. Press "Push to Cycle" button
2. Flush toilet as often as necessary, do not
exceed recommended flush volume.
Recommended Flush Volume -
Total flush volume must not exceed 1.5 gallons
(5.7 liters) per cycle.
After Toilet is flushed:
Water is diverted to the tablet dispenser and
must rise to the water level line (dotted line)
but no higher.
The Purasan should not be activated again
until the cycle is complete.
How it works -
Each time toilet is flushed an equal amount of
previously treated waste is discharged. The Purasan
does not pump waste out, the flushing action of the
toilet moves the waste through the Purasan.
Water is diverted to the tablet dispenser during the
flush cycle and should rise to the water level line
(dotted line), this creates a solution that drains into
the treatment unit.
The first chamber macerates to reduce particle size
and uniformly mix the waste with injected halogen
solution. The second chamber mixes to ensure
uniform treatment of contents.
When activated both motors come on and run for
the entire cycle of two minutes.
TABLET DISPENSER
LABEL
with water
level line
SWITCH PANEL