Set up – RedMax HBZ2610 User Manual
Page 8

US-8
HBZ2610
6. Set up
■ BLOWER PIPE
• Align groove in blower pipe with
projection on blower housing (or
another blower pipe) and slide the pipe
onto the blower housing (or another
blower pipe).
Rotate the pipe clockwise to lock it into
place.
■ INSTALLING SUPPORT HANDLE
• This handle is supplied with the blower.
• Fit the holes of volute and handle,
tighten the screws.
• Be sure to tighten the screws straightly.
(1) Support Handle
(2) Holes
(3) Screws
F1
F2
See also other documents in the category RedMax Fans:
- BACKPACK EBZ8000 (36 pages)
- EB4300 (22 pages)
- EBZ3000RH (60 pages)
- EBZ8000 (36 pages)
- US-1 EBZ5100Q (18 pages)
- EBZ8000RH (36 pages)
- EBZ5100RH-CA (60 pages)
- Gutter Clean-Outattachment GK-280 (20 pages)
- EBZ4800RH (32 pages)
- HBZ2600 (24 pages)
- EB6200 (22 pages)
- EB4401 (28 pages)
- EBZ7100-CA (60 pages)
- HBZ2500 (22 pages)
- EBZ8001-CA (60 pages)
- EBZ5000RH (36 pages)
- EBZ5100Q (56 pages)
- EB7001RH (32 pages)
- EBZ5100-CA (60 pages)
- HBZ2601 (56 pages)
- EBZ3050RH (16 pages)
- HB280 (76 pages)
- EBZ7150 (18 pages)
- EBZ8050RH (18 pages)
- EBZ5000Q (36 pages)
- EB4400 (28 pages)
- EBZ5150 (18 pages)
- HBZ2601-CA (52 pages)
- EBZ8001RH (56 pages)
- GK-280 (7 pages)
- EB7000 (28 pages)
- EBZ5000 (32 pages)
- HB250 (48 pages)