Step 7 : doors installation – Nuvo 500 User Manual
Page 11
~10~
~11~
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
4
5
6
7
1
2
3
5
6
7
1
2
3
4
5
6
7
1
2
4
5
6
7
1
2
3
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
5
6
7
1
2
3
4
5
6
7
1
2
4
5
6
7
1
2
3
4
5
6
7
1
2
3
5
6
7
1
2
3
4
5
6
7
4
4
33
444
Install
TOP HINGES with HEX BOLTS (B)
NOTE :
STEP 7 : DOORS INSTALLATION
Insert
DOORS onto
BOTTOM HINGES
1
2
1
B
D
2
Adjust fi nal position of the door
before tightening the bolts and
move cellar into place, leaving
4” clearance all around cellar.
MAKE SURE CABINET IS AIRTIGHT!
Adjust the level by turning
(counter clockwise) the
LEGS (H)
as needed. Use a carpenter’s level.
This manual is related to the following products: