Hardware packing list, Step 3, Step 4 – Nova Retrofit Kit 50-0-1818-34 User Manual
Page 2: Step 5 step 6, Figure 2
Review and identify Retrofit Kit parts listed above.
HARDWARE
PACKING LIST
Ref. # Item # Qty. Description
1
20060126 1 Keyboard
hanger with glide
– Left
2
20060105 2 Side
Assembly
3 20060101 2 Cross
Brace
4 20060127 1 Keyboard
hanger with glide
– Right
5
Varies with Retrofit
1 Keyboard
Drawer
6 10060127 1 Monitor
Support
7 5081070 1
Viewport Glass
8
50900258
4 Leveler
9 1412APPBO 18
Screw - #14x3/4"
10
50900032
6
Screw - #14x1-1/2"
11 TB-M 4
Tracking Block
TB-F 4
Tracking Block
12
6N50TXPZ
8
Screw - Security, #6x5/8"
13
5011818 2
Leg
14
50900034
4
Trim Ring Corner
15
50900035
4
Trim Ring Straight - B
16
5081060
1
Visor
17
FR2020/Clip
2
Locking Tab
OPTIONS
5081120 1
Power Strip
5081066 1
CPU Holder
5081018 1
Anti-Reflective Glass
Step 3
Attach Cross Braces (Ref. #3) to Side Assemblies (Ref. #2) using
eight (8) Screws (Ref. #9). See Figure 2.
Step 4
If you are not using optional floor support legs (Ref. #13),
skip to Step #7. Otherwise, attach Leg (Ref. #13) to Side
Assembly (Ref. #2) using two (2) Screws (Ref. #10). Repeat
procedure for other side. Insert Levelers (Ref. #8) into
bottom of Leg (Ref. #13). Repeat procedure for other side.
See Figure 2.
Step 5
Step 6
9
10
12
8
11
14
15
16
FIGURE 2
10
13
8
8
13
8
8
3
9
9
9
9
2
2
3
10
Page 2
Turn Retrofit Assembly upright. Slide under viewport cutout
in worksurface. Align holes in top rails of Side Assemblies
(Ref. #2) with holes in worksurface. Attach Retrofit Assembly
to the worksurface securely using six (6) Screws (Ref. #9).
Optional: Adjust Levelers (Ref. #8).
9
50-0-1818 Asy. Instr., © Nova Solutions, Inc. 2002
17
4