beautypg.com

Assembly / pre-operation – Poulan Pro PP1130ESA SNOW THROWER User Manual

Page 6

background image

6

ASSEMBLY / PRE-OPERATION

INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)

The auger control rod has the short loop on the end of the
spring as shown.

1. Slide rubber sleeve up rod and hook end of spring into

control arm with loop opening up as shown.

2. With top end of rod positioned under right side of control

panel, push down on rod and insert end of rod into hole
in auger control bracket. Secure with retainer spring.

INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD
(See Fig. 7)

NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.

1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotater head over chute bracket. If nec es -

sary, rotate chute assembly to align square and pin on un-
der side of chute rotater head with holes in chute brack et.

3. With chute rotater head and chute bracket aligned,

po si tion chute rotater head on pin and threaded stud
of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

CHUTE
ROTATER
HEAD

3/8 WASHER

3/8 LOCKNUT

THREADED

STUD

PIN

ROTATER HEAD

MOUNT ING

BRACKET

CHUTE
BRACKET

FIG. 7

TRACTION
DRIVE
CON TROL
ROD

DRIVE
CONTROL
BRACKET

RETAINER

SPRING

TRACTION DRIVE
CON TROL LEVER

FIG. 4

AUGER

CONTROL

LEVER

AUGER
CONTROL
ROD

AUGER

CONTROL

BRACKET

RETAINER
SPRING

FIG. 6

AUGER
CONTROL
ROD

CONTROL
ARM

RUBBER
SLEEVE

LOOP

OPENING

UP

FIG. 5