beautypg.com

Figure 35, Figure 34 – ParaBody 400102 User Manual

Page 24

background image

FIGURE 35

STEP 34

• Assemble one 3-1/2” PULLEY (79) around the PEC DEC CABLE (93) and to the PULLEY BRACKET (5) using one 3/8 X 1-3/4”

BOLT (36) and one 3/8” LOCKNUT (48) as shown in FIGURE 34.

24

FIGURE 34

93

STEP 35

• Slide the ends of the PEC DEC CABLE (93) into the bushings on the PEC CAMS (24) as shown on FIGURE 35.

• Lay the PEC DEC CABLE (93) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (21) as

shown in FIGURE 35. (NOTE: The bolt holding pulley and cable retaining clips may need to be loosened to align cable
retaining clips with cable.)

24

79

48

5

93

36 3/8 X 1-3/4”

21