Service and adjustments – Poulan 96092000500 User Manual
Page 16
16
SERVICE AND ADJUSTMENTS
CABLE CLIP
SCREW
DRIVE
CONTROL
CABLE
EXTENSION
SPRING
ENGINE
PULLEY
IDLER
PULLEY
TRANS MIS SION
PULLEY
LESS
TEN SION
5/8"
MORE
TEN SION
FIG. 26
TO REPLACE GROUND DRIVE BELT
(See Figs. 25 and 26)
• Remove belt guard as described in “TO REMOVE BELT
GUARD”.
• Remove old belt by slipping off engine pulley fi rst then
remove from transmission pulley.
• Place new belt in groove of transmission pulley and
into engine pulley. BELT MUST BE IN GROOVE ON
TOP OF IDLER PULLEY. NOTE POSITION OF BELT
TO GUIDES.
• Check belt adjustment as described below.
• Replace belt guard.
• Reposition wheel and replace clevis pin and hairpin
clip.
GROUND DRIVE BELT ADJUSTMENT
(See Fig. 26)
For proper belt tension, the extension spring should have
about 5/8 inch (16 mm) stretch when drive control bar is
in “EN GAGED” position. This tension can be attained as
fol lows:
• Loosen cable clip screw securing the drive control
cable.
• Slide cable forward for less tension and rearward for
more tension until about 5/8 inch (16 mm) stretch is
obtained while the drive control bar is engaged.
• Tighten cable clip screw securely.