beautypg.com

Operating modes, Advanced operation – Panamax BANKS WIRING MB1000 User Manual

Page 8

background image

6

Operating Modes

Automatic Regulation Setup

Setup for Automatic Voltage Regulation parameters.

Outlet Bank 2 Setup

Adjusts the battery charge threshold in which Outlet Bank 2 is

shut off to conserve power for the critical loads connected to

Outlet Bank 1.

If set to OFF, Outlet Bank 2 will shut off immediately when the

unit goes into UPS Mode.

IR1 Control Setup

IR1 Control Setup is a two-step process in which the IR remote

control signal is sampled, and tested by outputting the learned

signal on the output jack.

IR Output Delay

IR Output Delay is the time delay before outputting the IR signals

on the IR output jacks after the unit goes into UPS mode.

IR Output Delay time starts at 0 sec, incremented in 5 sec inter-

vals, with a maximum value of 60 sec.

Setup Buzzer Mode

Change the UPS BUZZER MODE to set it to on or off.

UPS Test Mode

UPS Test Mode places the unit in UPS Mode temporarily to

verify that the UPS inverter can adequately supply the connected

load.

System Info

Displays the brand, model number and firmware revision

A connection to a UPS can benefit projector bulbs, server based

products, and units with volatile electronic memories found in

but not limited to Pro Audio, Broadcast and High-End Home

Theater equipment. The MB1000 takes this to the next level with

a number of features designed specifically for AC Power back up

applications.

Critical Load Function

One of the user programmable settings in the MB1000 software

is the Low Battery Non-Critical Load (NCL) Shutoff threshold.

This sets the battery capacity level at the point where the NCL

outlets are turned off and all remaining battery power is reserved

for equipment plugged into the 4 critical load outlets. This value

is stored internally by the UPS and is not dependent on having

the software running on a computer.

Patent-pending Learning IR Control

The learning IR function lets you program the UPS to send

standby or shut-down commands to components such as DLP

ceiling projectors. If the power fails, the projector’s lamps are

turned off while the UPS continues providing battery power to

the projector’s cooling fan. Proper shutdown is ensured and

expensive lamps are protected from damage.

Note: This function should only be used with discrete IR codes.

Programming an On/Off toggle command could result in the

equipment being turned ON during a power failure!

IR Power Failure Operation

The UPS can learn two IR commands. The learned commands

will be transmitted on both output jacks so you have the ability to

control 2 different pieces of equipment or use a 2-step macro for

one component.

1. After a power failure and the selected delay, the IR codes will

be sent to both outputs. The IR LED’s will flash once per second

during the delay time and will stop flashing after the IR code is

sent.

Advanced Operation

This manual is related to the following products: