beautypg.com

Assembly / pre-operation – Poulan Pro 96192001902 SNOW THROWER User Manual

Page 7

background image

7

ASSEMBLY / PRE-OPERATION

INSTALL DISCHARGE CHUTE / CHUTE ROTATOR

HEAD (See Fig. 7)
NOTE:
The multi-wrench provided in your parts bag may

be used to install the chute rotator head.
1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotator head over chute bracket. If nec es -

sary, rotate chute assembly to align square and pin on un-

der side of chute rotator head with holes in chute brack et.

3. With chute rotator head and chute bracket aligned,

po si tion chute rotator head on pin and threaded stud

of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-

tory for shipping purposes. Correct and equal tire pres sure

is important for best snow throwing performance.
• Reduce tire pressure to 14-17 PSI (19-24.5 N-m).

INSTALL CHUTE DEFLECTOR REMOTE CONTROL

(See Figs. 8 and 9)
1. Install remote cable bracket to discharge chute with

5/16-18 carriage bolt and 5/16-18 locknut as shown.

Tighten securely.

2. Install remote cable eyelet to chute deflector with

1/4-20 shoulder bolt, nylon washer and 1/4-20 locknut

as shown. Tighten securely.

3. Install spring hooks between hex nuts on chute rotater

head and into hole in chute deflector as shown.

CHUTE DEFLECTOR

CONTROL LEVER

FIG. 9

CHUTE

ROTATOR

HEAD

3/8 WASHER

3/8 LOCKNUT

THREADED

STUD

PIN

ROTATOR HEAD

MOUNT ING

BRACKET

CHUTE

BRACKET

FIG. 7

ALIGN BEFORE

TIGHTENING LOCKNUT

HOOK

BE TWEEN HEX

NUTS

ON CHUTE

ROTATER HEAD

SPRING

CHUTE

DE FLEC TOR

5/16-18

CARRIAGE

BOLT

5/16-18

LOCKNUT

REMOTE

CABLE

BRACKET

1/4-20

LOCK NUT

CABLE

EYELET

NYLON

WASHER

1/4-20

SHOULDER

BOLT

FIG. 8