beautypg.com

Feed upper cable, Step 12. feed upper cable – Precor Strength-Training S3.25 User Manual

Page 24

background image

S3.25 Assembly and Maintenance Guide

page 24

1

2

3

4

5

6

12. Feed Upper Cable

A. Attach a 4½-inch pulley to the top of the Main

Upright using
one 4¼-inch bolt
two washers
one barrel spacer
one locknut

B. Attach a 4½-inch pulley to the Angle Bracket at the

top of the Main Upright using
one 2½-inch bolt
two washers
one barrel spacer
one locknut

C. Feed the U end of Cable 44370-103 through the

pulley window in the Top Beam. Wrap the Cable over
a 4½-inch pulley and attach the pulley to the Top
Beam using
one 2¾-inch bolt
two step spacers
one locknut

D. Create a retainer pin in the remaining hole of the

Top Beam using
one 2¾-inch bolt
two washers
one locknut

E. Run the cable above the Top Beam and down

through the next pulley window and around a
4½-inch pulley. Attach the pulley to the Top Beam
using
one 3½-inch bolt
two step spacers
one locknut
one washer
one barrel spacer
one surgical tube
Wrench tighten.

F.

Wrap the Cable around the pulleys as indicated
in the diagram and through the hole in the Guide
Rod Bracket.

Step 12. Feed Upper Cable

1 - 4½" pulley
1 - 2¾" bolt
2 - step spacers
1 - locknut

C

Pulley Window

Pulley Window

Top Beam

1 - 2¾" bolt
2 - washers
1 - locknut

D

E

1 - 4½" pulley
1 - 3½" bolt
2 - step spacers
1 - locknut
1 - washer
1 - barrel spacer
1 - surgical tube

Main Upright

Guide Rod Bracket

B

1 - 4½" pulley
1 - 2½" bolt
2 - washers
1 - barrel spacer
1 - locknut

Angle Bracket

Main Upright

A

1 - 4½" pulley
1 - 4¼" bolt
2 - washers
1 - barrel spacer
1 - locknut

F

Cable 44370-103