beautypg.com

Assembly / pre-operation – Poulan 424704 User Manual

Page 6

background image

6

ASSEMBLY / PRE-OPERATION

INSTALL DISCHARGE CHUTE / CHUTE ROTATER

HEAD (See Fig. 7)
NOTE:
The multi-wrench provided in your parts bag may

be used to install the chute rotater head.
1. Place discharge chute assembly on top of chute base

with discharge opening toward front of snow thrower.

2. Position chute rotater head over chute bracket. If nec es -

sary, rotate chute assembly to align square and pin on un-

der side of chute rotater head with holes in chute brack et.

3. With chute rotater head and chute bracket aligned,

po si tion chute rotater head on pin and threaded stud

of mounting bracket.

4. Install 3/8 washer and locknut on threaded stud and

tighten securely.

CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-

tory for shipping purposes. Correct and equal tire pres sure

is important for best snow throwing performance.
• Reduce tire pressure to 14-17 PSI (19-24.5 N-m).

INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the

spring as shown.
1. Slide rubber sleeve up rod and hook end of spring into

control arm with loop opening up as shown.

2. With top end of rod positioned under right side of

control panel, push down on rod and insert end of rod

into hole in auger control bracket. Secure with retainer

spring.

AUGER

CONTROL

LEVER

AUGER CONTROL ROD

AUGER

CONTROL

BRACKET

RETAINER

SPRING

FIG. 6

CHUTE

ROTATER

HEAD

3/8 WASHER

3/8 LOCKNUT

THREADED

STUD

PIN

ROTATER HEAD

MOUNT ING

BRACKET

CHUTE

BRACKET

FIG. 7

ALIGN BEFORE

TIGHTENING LOCKNUT

AUGER

CONTROL

ROD

CONTROL

ARM

RUBBER

SLEEVE

LOOP

OPENING

UP

FIG. 5