beautypg.com

Installation – Lopi Yankee Bay Pellet Insert User Manual

Page 9

background image

Installation

9

Travis Industries

4 0 5 0 5 0 9

1 0 0 - 0 1 1 4 5

Remove the correct knock-outs in the hopper walls following the directions below.

Use a center-punch (or other suitable

tool) to remove the appropriate knock-

outs in the hopper walls (punch the

holes out from the inside). Make sure

to support the hopper walls while

removing the knock-outs. There are 11

knock-outs for each position.

If you are using hopper extension position F, remove

the top knock-out. If using position E, remove the

second knock-out, (etc...). The second-to-bottom

knock-out is position B.

Position A Knock-Out

Position B Knock-Out

Position C Knock-Out

Position D Knock-Out

Position E Knock-Out

Position F Knock-Out

Re-install the hopper walls following the directions below.

HINT:

Attach one screw to each

side to align the hopper walls. Then

install the remaining screws.

NOTE:

This hopper extension is in position D.

Attach the hopper top following the directions below.

Re-attach the hopper top to the

hopper walls using the screws

included with the insert.

Before installing the

hopper top, use a center-

punch (or other suitable

tool) to remove the

appropriate knock-outs

on the hopper top.