Kohler COMMAND CH18-745 User Manual
Page 210

11.25
Section 11
Reassembly
11
Figure 11-83. Throttle/Choke Control Bracket Detail.
Install Oil Sentry
™
(If So Equipped)
1. Apply pipe sealant with Teflon
®
(Loctite
®
No.
59241 or equivalent) to the threads of the Oil
Sentry
™
switch and install it into the breather
cover. See Figure 11-84. Torque to 4.5 N·m
(40 in. lb.).
2. Connect the wire lead (green) to the Oil Sentry
™
terminal.
Install Control Panel (If So Equipped)
1. Install the panel to the blower housing.
2. Connect the throttle control cable or shaft.
3. Connect the choke control cable to the control
bracket.
4. Connect the Oil Sentry™ indicator light wires.
Figure 11-84. Installing Oil Sentry
™
Switch.
Item
Description
1
Bracket, speed control
2
Clamp, cable (some applications)
3
Kill Switch (some applications)
4
Lever, choke (top position)
5
Lever, throttle control (middle)
6
Linkage, choke control
7
Lever, throttle actuator (bottom)
8
Screw, M5x0.8x20
9
Washer, wave
10
Washer, flat (3)
11
Spring, choke return
12
Nut, M5x0.8 lock