Installation – SPX Cooling Technologies MARLEY MH MHF705 User Manual
Page 6
6
The fluid cooler must be located at such distance and direction to
avoid the possibility of contaminated fluid cooler discharge air be-
ing drawn into building fresh air intake ducts. The purchaser should
obtain the services of a Licensed Professional Engineer or Registered
Architect to certify that the location of the fluid cooler is in compli-
ance with applicable air pollution, fire and clean air codes.
Tower Shipment
Unless otherwise specified, the MH Fluid Cooler ships by truck (on flat
bed trailers), which lets you receive, hoist, and install the tower in one
continuous operation. Single-cell single-flow fluid coolers ship on one
truck. Double-flow and multicell fluid coolers, depending on their size,
may require more than one truck.
Responsibility for the condition of the fluid cooler upon its arrival belongs to
the trucker—as does the coordination of multiple shipments, if required.
receiving Fluid Cooler
Prior to unloading the fluid cooler from the delivering carrier, inspect the
shipment for evidence of damage in transit. If damage is apparent, note
the freight bill accordingly. This will support your future recovery claim.
Find and remove the installation instruction drawings and bills of mate-
rial located in a plastic bag in the water collection basin. This information
should be kept for future reference and maintenance purposes.
Hoisting Fluid Cooler
All MH Fluid Cooler models must use hoist clips and overhead lifting for
handling assembled fluid cooler.
Forklifting from base of fluid cooler
is not permitted. The clips for the top modules are located at the fan
deck level. The clips for the lower modules are located at the bottom of
the modules at the water collection basin. A
Hoisting-installation label
which has hoisting dimensional information is located on the side casing
near the tower centerline. Remove tower from the carrier and hoist into
place according to the instructions on the label.
MH Fluid Cooler upper and lower modules must be hoisted and set
separately. Do not preassemble modules prior to hoisting.
Installation
Warning
Caution