Important – Spalding M881119 User Manual
Page 29
12/05
ID# M881111
29
Fill pole with concrete approximately 1” (2.54
cm) below bottom elevator hole as shown.
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.
CONCRETE MUST CURE.
1
9.
IMPORTANT!:
FAILURE TO FILL YOUR
POLE COMPLETELY
WITH CONCRETE AS
DESCRIBED IN THESE
INSTRUCTIONS WILL
VOID ALL WARRANTIES
WRITTEN AND IMPLIED.
IMPORTANT!:
Make sure that
concrete does not bulge
from the end of pole
assembly. Allow
concrete to completely
cure.
10.
Install net (34).
B.
D.
C.
A.
34
34